The next KIWI SINK dig will be 10 March. I will be out of town but
there are 7 barrels on the bottom ready to be filled. Try to continue
working on removing the floor material so the minimum amount of that
material will fall through when we finally have the area stabilized
enough to break through to the lower level of clean-washed breakdown.
--Ediger

---------------------------------------------------------------------
Visit our website: http://texascavers.com
To unsubscribe, e-mail: texascavers-unsubscr...@texascavers.com
For additional commands, e-mail: texascavers-h...@texascavers.com

Reply via email to