Special article
1 September 2012

Doomed UPA~II


In The Name Of God, Resign And Go

sam rajappa

As Shakespeare had said in Julius Caesar:

There is a tide in the affairs of men
Which, taken at the flood leads to fortune,
Omitted, all the voyage of their life
Is bound in shallows and miseries.

THE UPA II government of Prime Minister Manmohan Singh has missed the
tide. By continually taking unjust decisions, depriving the needy of
justice and robbing the poor of their rights, he has lost the right to
preside over the destiny of India. His continuance in office can only
add to the miseries of the people. In the ongoing coal scandal, the
question one should ask is what made the Prime Minister cling to the
coal portfolio for so long almost as if there was a dearth of talent
in his jumbo Council of Ministers and that he did not have enough
responsibility without poking his nose into allotment of coal blocks.
No Prime Minister before him has coveted coal in quite the same
manner.

His explanation that coal blocks were given at subsidised price to
private companies so that the common man could get electricity, cement
and steel at a reasonable price is an insult added to the injury
inflicted on people groaning under the weight of price rise of these
items. Cement price has scaled such Himalayan heights in the last few
years that building a shelter has become out of bounds for the common
man.  Steel price is not lagging far behind. As far as electricity is
concerned, the less said the better.
Giving away coal blocks to those not equipped to mine and keeping the
black gold in mother earth was a definite ploy to create a power
crisis to prepare the ground for signing the Indo-US Nuclear Agreement
and importing foreign nuclear reactors to generate electricity at huge
cost to the exchequer.

Coal is a national asset. Indira Gandhi nationalised the coal industry
in 1973 and put an end to profiteering by private mine owners, and
stabilised its price for the common good. During Prime Minister PV
Narasinha Rao’s time, Manmohan Singh as Finance Minister paved the way
for its privatisation in 1993 and opened the floodgates of
corruption.

When the UPA came to power in 2004, Sibu Soren was allotted the coal
portfolio. On his getting arrested in a murder case, Manmohan Singh
took over the portfolio. As charges of corruption mounted, he assured
Parliament in 2006 that all future allotment would be done through
competitive bidding. The Law Ministry advised that the change could be
brought about by an administrative order, but the Prime Minister
routed for an amendment to the Mines and Minerals Act to play for time
and obtained second opinion from the Law Ministry to suit his plan.

Ministers are there to oblige the Prime Minister.  Did he not obtain
legal opinion of HR Bharadwaj, former Union Law Minister, before de-
freezing Italian businessman Ottavio Quattrocchi’s London bank account
into which part of Bofors kickback was remitted? Even six years after
Manmohan Singh’s assurance in Parliament, the proposed amendment to
the Coal Act has not seen the light of day. Meanwhile, allotment to
crony capitalists has continued.

While the Comptroller and Auditor-General assessed the windfall gains
to the coal block allottees at Rs 1.86 lakh crore, official records in
the Coal Ministry tell a different story. Between 1993 and 2010, 184
mines had been allotted to favoured private parties and a total of
21,531.32 million tonnes of coal had been taken out. The average sale
price during this period was Rs 2,500 per tonne. The cost of
exploitation, including a profit margin of 25 per cent, worked out to
Rs 1,250 per tonne. By this calculation, the presumptive loss to the
government is about Rs 27 lakh crore.

If the government’s policy not to auction coal blocks was to speed up
industrialisation, one could understand. But that was not the case. It
was to leave the coal in the ground until Manmohan Singh’s goal of a
Indo-US Nuclear Agreement was signed and precious thorium, the future
fuel of nuclear energy, was bartered away for a mess of pottage.

Thorium is the future fuel cycle to produce long-term nuclear energy
with low radio-toxicity waste. There has always been a strong
incentive for the development of thorium fuels and fuel cycles because
of large deposits of this precious mineral in the form of monazite in
the country’s beach sands  compared to the very modest uranium
reserves. Thorium cycles are feasible in all existing thermal and fast
reactors without major modifications in the engineering systems,
reactor control and the reactivity devices. The proceedings of the
annual conference of Indian Nuclear Society on “Power from thorium:
status, strategies and directions,” held in Mumbai in June 2000, and
the EURATOM report on thorium as a waste management option, give a
comprehensive review of all aspects of thorium fuels and fuel cycles.

Former President Abdul Kalam has been stressing the importance of
India pursuing the thorium fuels route for its nuclear power plants
instead of going with a begging bowl to the USA and the Nuclear
Supplier Group countries to fuel the existing 17 nuclear reactors
based on enriched uranium, and accept their conditionalities which are
detrimental to our national interests. The moment India tries another
Pokhran-type peaceful nuclear explosion, the Nuclear Supplier Group
would not only stop supplying enriched uranium but also remove past
supplies from the 17 running reactors in the country and bring them to
a grinding halt.

Thanks to our nuclear isolation prior to signing the Indo-US
Agreements, scientists at BARC developed a research  fast breeder
reactor using thorium as fuel and it has been functioning at the
Indira Gandhi Centre for Atomic Research, Kalpakkam, 60 km from
Chennai, for the last 27 years. Based on the experience gained, work
began on a 500 MW fast breeder reactor at Kalpakkam which should have
been commissioned in 2010 but the UPA government is more interested in
importing highly risky uranium based nuclear reactors from foreign
countries and going slow on the indigenous technology.

Explaining the salient features of the indigenously built 500 MW
thorium fuelled reactor, SC Chetal, director of IGCAR, said that it
would breed more fuel than it consumes. Thorium is rated as a clean
fuel because of its low radio-toxicity. The long term sustainability
of the indigenous nuclear power programme in India depends to a great
extent on large-scale utilisation of the vast thorium resources for
breeding uranium and recycling the same in self-sustaining closed fuel
cycle in thermal breeder reactors.

The International Atomic Energy Agency, in a publication titled
“Thorium fuel cycle ~ Potential benefits and challenges,” dated May
2005, says that research studies have shown that thorium-based fuels
“do have several characteristics in the tight pitch lattice designs
such as a more negative void coefficient, a high fuel conversion
ratio, improved non-proliferation characteristics and a reduced
production of long lived radio-toxic wastes than corresponding uranium
based fuels.”

The Nuclear Energy Research Initiative (NERI) project of the US
Department of Energy has developed an innovative fuel matrix
consisting of thorium. Japan is pursuing research and design
activities on innovative thorium-based hydride fuels for advanced
Minor Actinides and plutonium burners with high-safety
characteristics. Both countries are mopping up all available thorium
from India. The high degree of chemical stability and low solubility
of thorium make irradiated thorium-based fuels attractive as waste
forms for direct geological disposal.

Therefore, conserving and protecting thorium reserves has the
potential to catapult India as the world’s pre-eminent nuclear energy
producer. India’s proven scientific talent in fast breeder reactors
using thorium to breed plutonium with dual uses should form an
integral part of the country’s nuclear doctrine rather than the
country remaining a supplicant of the Nuclear Supplier Group.

The writer is a veteran journalist and former Director, Statesman
Print Journalism School

Reply via email to