Martin

I think Andrew is referring to a Total Station survey, though I presume that
data from an old fashioned theodolite would look much the same. What he
needs, I guess, is an automatic way of correcting (calibrating?) the
horizontal angles with regard to North when the traverse is connected in to
fixed points at either end.

Graham
-------------- next part --------------
A non-text attachment was scrubbed...
Name: smime.p7s
Type: application/pkcs7-signature
Size: 4821 bytes
Desc: not available
URL: 
<http://mailman.speleo.sk/pipermail/therion/attachments/20150610/bc4bbf77/attachment.bin>

Reply via email to