Martin I think Andrew is referring to a Total Station survey, though I presume that data from an old fashioned theodolite would look much the same. What he needs, I guess, is an automatic way of correcting (calibrating?) the horizontal angles with regard to North when the traverse is connected in to fixed points at either end.
Graham -------------- next part -------------- A non-text attachment was scrubbed... Name: smime.p7s Type: application/pkcs7-signature Size: 4821 bytes Desc: not available URL: <http://mailman.speleo.sk/pipermail/therion/attachments/20150610/bc4bbf77/attachment.bin>