Unless you are in a *very* unusual location, put it on a UPS. 

Bob

> On Feb 5, 2017, at 6:27 PM, Skip Withrow <skip.with...@gmail.com> wrote:
> 
> Hello time-nuts,
> 
> I have 5061A and 5061B units with the battery option and dead battery
> packs.  My question is what makes the most sense when refurbing these units?
> 
> 1.  Yank the old battery out and just leave it that way.  Running the unit
> on a UPS would preserve the functionality.
> 
> 2. Replace the pack with a rebuilt NiCd pack.  I'm sure Batteries Plus
> would be happy to do it, but sounds expensive.
> 
> 3. Replace the pack with a NiMH pack, and really crank down the float
> current of the 5061.
> 
> 4. Replace the pack with Li-ion battery.  Would be a much smaller battery,
> but the charging circuit would have to be pitched.  Building in a Li-ion
> charge controller sounds like it could be a project (which I don't
> necessarily want).
> 
> 5. Yank the old battery pack and run the 5061 on two 12V batteries with an
> appropriate power supply/charger (basically a version of #1).
> 
> Any thoughts on these or other options would be appreciated.  Thanks in
> advance.
> 
> Regards,
> Skip Withrow
> _______________________________________________
> time-nuts mailing list -- time-nuts@febo.com
> To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
> and follow the instructions there.

_______________________________________________
time-nuts mailing list -- time-nuts@febo.com
To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
and follow the instructions there.

Reply via email to