On Sun, Oct 26, 2014 at 12:57 AM, Peter Suter <[email protected]> wrote:

On 26.10.2014 05:12, RjOllos wrote:
>
>> I'm hopeful that we can have a 2-month release cycle going forward, with
>> the next release by Jan 1st. That set of releases will include 0.12.7.
>>
>
> 2-month release cycle would be great. It sounds very ambitious, but you
> now probably know best if and how it is achievable.
>
> I assume this means a simplified release process e.g. without
> string-freeze periods? (Personally I think the faster iteration time would
> more than compensate any drawbacks.)
>

It will probably be a bit challenging, but should be much more achievable
as we tweak and script more of the release process. I think there are some
small things that we can do, such as #11725, which together will make the
whole process a bit easier. Even just having a smaller set of tickets will
make writing the change log easier, or we can do that part as we progress
through the milestone.

trac.edgewall.org/ticket/11725

-- 
You received this message because you are subscribed to the Google Groups "Trac 
Development" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/trac-dev.
For more options, visit https://groups.google.com/d/optout.

Reply via email to