On Sun, Oct 26, 2014 at 12:57 AM, Peter Suter <[email protected]> wrote:
On 26.10.2014 05:12, RjOllos wrote: > >> I'm hopeful that we can have a 2-month release cycle going forward, with >> the next release by Jan 1st. That set of releases will include 0.12.7. >> > > 2-month release cycle would be great. It sounds very ambitious, but you > now probably know best if and how it is achievable. > > I assume this means a simplified release process e.g. without > string-freeze periods? (Personally I think the faster iteration time would > more than compensate any drawbacks.) > It will probably be a bit challenging, but should be much more achievable as we tweak and script more of the release process. I think there are some small things that we can do, such as #11725, which together will make the whole process a bit easier. Even just having a smaller set of tickets will make writing the change log easier, or we can do that part as we progress through the milestone. trac.edgewall.org/ticket/11725 -- You received this message because you are subscribed to the Google Groups "Trac Development" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/trac-dev. For more options, visit https://groups.google.com/d/optout.
