Good Aftternoon, I am fairly new with managing/administering TRAC and subversion on my project. I have been tasked with conducting an upgrade of TRAC from version 0.12.1 to version 0.12.2. We use a subversion repository. What is the best way to conduct this ugrade? I am starting by using a test version that is running on a development server. My plan was to load a subversion dump from the production server into subversion that is running on the development server. Next, I planned to resync TRAC with the repository and then conduct the upgrade of TRAC to version 0.12.2. Is this a sound method for conducting this upgrade?
-- You received this message because you are subscribed to the Google Groups "Trac Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/trac-users?hl=en. For more options, visit https://groups.google.com/groups/opt_out.
