Le dimanche 23 octobre 2016 19:05:03 UTC+2, Cédric Krier a écrit : > > Hi, > > With the #TUB2016 code sprint, there are still some patches waiting to > be included. I would like to give one extra week to finish and include > them. This means that we need to postpone the release that was planned > the 21st to the 28th November. > > Is there no problem? > Ok for us @ saluc :-)
-- You received this message because you are subscribed to the Google Groups "tryton-dev" group. To view this discussion on the web visit https://groups.google.com/d/msgid/tryton-dev/4b643c27-75ab-4e31-af81-7c28c82cf088%40googlegroups.com.