Hello, I was able to process the production works and change the status to 'finished' for all works. Finally, I was trying to change the production status from 'running' to 'done' by pressing 'done' button. But it shows me an error -"The costs of the outputs (1079.80000) of production "7" do not match the cost of the production (1898.2800).". Does it mean the cost value of the finished goods need to be equal to cost of the production?
-- You received this message because you are subscribed to the Google Groups "tryton" group. To view this discussion on the web visit https://groups.google.com/d/msgid/tryton/2c30d27c-7683-4d8d-81b2-1de1ffcef6d9%40googlegroups.com.