** Description changed:

  We're now in a position to have 1.22.5 enter trusty-proposed.
  
  [SRU Information]
  
  juju-core has a stable release exception in
  https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions,
  including for major version updates.
  
+ [Devel Fix]
+ [sinzui] Prepare source package, and diffs.
+ [rbasak] Review package and upload of new upstream release with packaging 
review.  Will remove the block-proposed tag when verification has passed, and 
then this update should migrate to vivid.
+ 
  [Stable Fix]
  
- Full backport of new upstream release to trust.
+ Full backport of new upstream release to trust, utopic, vivid, .
  
  [Pre-QA tasks]
  
- [<person>] Upload to the current LTS release (trusty-proposed): TODO
+ [<rbasak>] Upload to the current LTS release (trusty-proposed): TODO
  
  [QA Status]
  
  Since there are multiple verifications required, they are listed here as
  a work item whiteboard status type thing rather than try and track them
  in a single tag. Please do not mark verification-done or remove block-
  proposed until all following items have passed. If any of these items
  fail, this bug should be marked verification-failed immediately.
  
  [sinzui] Upstream QA test against Trusty: TODO
  [sinzui] Upstream release process complete: TODO
  
  Manual tests required:
  
  [sinzui] Test juju-quickstart against trusty-proposed: TODO
  [sinzui] Test juju-deployer against trusty-proposed: TODO
  
  The following stakeholders have expressed an interest in performing
  their own tests and we will wait for a (timely) acknowledgement from
  them before removing the -proposed blocks. If you also have an interest
  in testing new Juju releases before they land in an SRU, then please
  comment in this bug.
  
  Landscape team QA: TODO

** Description changed:

  We're now in a position to have 1.22.5 enter trusty-proposed.
  
  [SRU Information]
  
  juju-core has a stable release exception in
  https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions,
  including for major version updates.
  
  [Devel Fix]
+ 
  [sinzui] Prepare source package, and diffs.
  [rbasak] Review package and upload of new upstream release with packaging 
review.  Will remove the block-proposed tag when verification has passed, and 
then this update should migrate to vivid.
  
  [Stable Fix]
  
  Full backport of new upstream release to trust, utopic, vivid, .
  
  [Pre-QA tasks]
  
  [<rbasak>] Upload to the current LTS release (trusty-proposed): TODO
  
  [QA Status]
  
  Since there are multiple verifications required, they are listed here as
  a work item whiteboard status type thing rather than try and track them
  in a single tag. Please do not mark verification-done or remove block-
  proposed until all following items have passed. If any of these items
  fail, this bug should be marked verification-failed immediately.
  
  [sinzui] Upstream QA test against Trusty: TODO
  [sinzui] Upstream release process complete: TODO
  
  Manual tests required:
  
  [sinzui] Test juju-quickstart against trusty-proposed: TODO
  [sinzui] Test juju-deployer against trusty-proposed: TODO
  
  The following stakeholders have expressed an interest in performing
  their own tests and we will wait for a (timely) acknowledgement from
  them before removing the -proposed blocks. If you also have an interest
  in testing new Juju releases before they land in an SRU, then please
  comment in this bug.
  
  Landscape team QA: TODO

-- 
You received this bug notification because you are a member of Ubuntu
Server Team, which is subscribed to juju-core in Ubuntu.
https://bugs.launchpad.net/bugs/1462001

Title:
  1.22.5 is not packaged in trusty

To manage notifications about this bug go to:
https://bugs.launchpad.net/ubuntu/+source/juju-core/+bug/1462001/+subscriptions

-- 
Ubuntu-server-bugs mailing list
Ubuntu-server-bugs@lists.ubuntu.com
Modify settings or unsubscribe at: 
https://lists.ubuntu.com/mailman/listinfo/ubuntu-server-bugs

Reply via email to