Hi,

 When i test 1.10.0, i found i must to set savepoint path otherwise i can’t 
stop the job. I confuse about this, beacuse as i know, savepoint offen large 
than checkpoint, so i usually resume job from checkpoint. Another problem is 
sometimes job throw exception and i can’t trigger a savepoint, so i cancel the 
job and change logical, resume it from last checkpoint. although sometimes will 
failed, i think this will be a better way, because i can choose cancel with a 
savepoint or not, so i can decede how to resume. but in 1.10.0, i must to set 
it, and seems system will trigger savepoint, i think this will take more risk, 
and it will delete checkpoint even i set retain on cancellation. so i have no 
checkpoint left. If i usecancel jobID, it will break with exception.
So how to work with 1.10.0 ? any advice will be helpful.
 Thanks.

Reply via email to