Can I use the FairScheduler to limit the number of map/reduce tasks directly from the job configuration? E.g. I have 1 job that I know should run a more limited # of map/reduce tasks than is set as the default, I want to configure a queue with a limited # of map/reduce tasks, but only apply it to that job, I don't want to deploy this queue configuration to the cluster.
Assuming the above answer is 'yes', if I were to limit the # of map tasks to 10 in a cluster of 10 nodes, would the fair scheduler tend to distribute those 10 map tasks evenly across the nodes (assuming a cluster that's otherwise unused at the moment), or would it be prone to over-loading a single node just because those are the first open slots it sees? David