Hello again,

I am running Hama v0.6.0 with Hadoop v1.0.4.

I checked groom logs, but groom didn't writing any logs. Also no task logs 
exists due to the fact that my job is failing too early. I tried to change the 
log level (in hama-daemon.sh export HAMA_ROOT_LOGGER="INFO,DRFA" to DEBUG) but 
nothing useful came up.

When I was playing around, I changed in conf/hama-default.xml the 
bsp.tasks.maximum to 20 (I know that I'm suppose to overwrite variables to 
hama-site.xml). And everything start working.

Is this expected to work like this? As far as I understand, for some reason I 
can't overwrite the configuration through my code. Also, what about the guide 
(http://wiki.apache.org/hama/WriteHamaGraphFile) is it suppose to work with 1 
task?

Thanks again,
Anastasis

P.S.
I noticed that, when I was trying to change the debug level of Hama through 
log4j.properties, nothing happened. Is that ok too? Or is something wrong with 
my installation?

On 10 Μαρ 2013, at 12:46 π.μ., Edward J. Yoon <[email protected]> wrote:

> What version of Hama? and you need to check the groom-server logs and task 
> logs.
> 
> On Sun, Mar 10, 2013 at 3:27 AM, andronat_asf <[email protected]> 
> wrote:
>> Hello everyone,
>> 
>> I was reading the tutorial for Google Web dataset (local mode, pseudo 
>> distributed cluser) at http://wiki.apache.org/hama/WriteHamaGraphFile.
>> 
>> I downloaded a Graph (~1GB) and uploaded it to hdfs. The file was splitted 
>> in 17 hdfs chunks. (I remind that I am trying to run in pseudo distributed 
>> mode, I have everything in my laptop).
>> 
>> ls -l /tmp/hadoop/dfs/data/current/  | grep -v 'meta' | wc -l
>>      17
>> 
>> Then I tried to run a code I wrote based on the example but:
>> 
>> # tail -f hama-my-bspmaster-my.local.log
>> 
>> 2013-03-09 20:09:47,060 INFO org.apache.hama.bsp.JobInProgress: num 
>> BSPTasks: 17
>> 2013-03-09 20:09:47,100 INFO org.apache.hama.bsp.JobInProgress: Job is 
>> initialized.
>> 2013-03-09 20:09:47,103 ERROR org.apache.hama.bsp.SimpleTaskScheduler: Could 
>> not schedule all tasks!
>> 2013-03-09 20:09:47,103 ERROR org.apache.hama.bsp.SimpleTaskScheduler: 
>> Scheduling of job Hama Graph Loader could not be done successfully. Killing 
>> it!
>> 
>> My configuration is:
>> 
>> HamaConfiguration conf = new HamaConfiguration(new Configuration());
>> conf.set("bsp.local.tasks.maximum", "1");
>> 
>> GraphJob graphJob = new GraphJob(conf, HamaGraphLoader.class);
>> graphJob.setNumBspTask(1);
>> 
>> I also tried to change the values of:
>> 
>> conf.set("bsp.tasks.maximum", "1");
>> conf.set("bsp.max.tasks.per.job", "1");
>> conf.set("mapred.map.tasks", "1");
>> conf.set("mapred.min.split.size", String.valueOf(Long.MAX_VALUE));
>> 
>> I even changed the according variables from hama-default.xml but nothing 
>> seems to be working. The number of BSPTasks remain to 17.
>> 
>> I attach my full configuration just in case.
>> 
>> Thank you in advance,
>> Anastasis
>> 
> 
> 
> 
> -- 
> Best Regards, Edward J. Yoon
> @eddieyoon
> 

Reply via email to