Sorry missed out the regex

+ JSR223 Post Processor A

+ JSR223 Pre Processor C (was Post Processor C)

+ Sampler
- + JSR223 Post Processor B
- + Regular Expression Extractor

-----Original Message-----
From: Stuart Kenworthy [mailto:[email protected]]
Sent: 06 September 2017 09:32
To: JMeter Users List <[email protected]>
Subject: RE: Multiple Post-Processor execution order

So you would have

+ JSR223 Post Processor A

+ JSR223 Pre Processor C (was Post Processor C)

+ Sampler

- + JSR223 Post Processor B

- + Regular Expression Extractor

Thanks

-----Original Message-----
From: Stuart Kenworthy
Sent: 06 September 2017 09:30
To: JMeter Users List <[email protected]>
Subject: RE: Multiple Post-Processor execution order

The problem you have is the 2 defined outside the sampler are read before the 
sampler is run so they will run first. The only true way to control it is to 
have them within the sampler.

If you are just logging specific fields to file, grab the values using regex 
and then use a pre-processor instead so the logging is done before running the 
next sampler, if I understand your intentions correctly.

-----Original Message-----
From: Andrew Burton [mailto:[email protected]]
Sent: 06 September 2017 03:36
To: JMeter Users List <[email protected]>
Subject: Multiple Post-Processor execution order

Hi,



Is there any way to control the execution order of post processors that apply 
globally vs. those that are sampler-specific?



My use case is that I want to record sampler-specific MDC elements within a 
sampler’s post processor, and have a generic post processor that does the 
logging. E.g. Get the exact error message in the sampler’s post processor (and 
the response payload may differ from sampler to sampler, hence the need to have 
a sampler-specific post processor), and have a generic thread group post 
processor which logs a message if the request fails.



For example, the tree would be:



Thread Group

+-JSR223 Post Processor A

+-Sampler

  +- JSR223 Post Processor B

+- JSR223 Post Processor C



The sequence order appears to be:

Sampler

Post Processor A

Post Processor C

Post Processor B



If I add specific items to the MDC in Post Processor B, then with the above 
execution order, they won’t be available in A or C.



Would be keen to hear from others who’ve used MDC for additional logging 
similar to this.



Regards



Andrew

The information included in this email and any files transmitted with it may 
contain information that is confidential and it must not be used by, or its 
contents or attachments copied or disclosed to, persons other than the intended 
addressee. If you have received this email in error, please notify BJSS. In the 
absence of written agreement to the contrary BJSS' relevant standard terms of 
contract for any work to be undertaken will apply. Please carry out virus or 
such other checks as you consider appropriate in respect of this email. BJSS 
does not accept responsibility for any adverse effect upon your system or data 
in relation to this email or any files transmitted with it. BJSS Limited, a 
company registered in England and Wales (Company Number 2777575), VAT 
Registration Number 613295452, Registered Office Address, First Floor, Coronet 
House, Queen Street, Leeds, LS1 2TW.

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

The information included in this email and any files transmitted with it may 
contain information that is confidential and it must not be used by, or its 
contents or attachments copied or disclosed to, persons other than the intended 
addressee. If you have received this email in error, please notify BJSS. In the 
absence of written agreement to the contrary BJSS' relevant standard terms of 
contract for any work to be undertaken will apply. Please carry out virus or 
such other checks as you consider appropriate in respect of this email. BJSS 
does not accept responsibility for any adverse effect upon your system or data 
in relation to this email or any files transmitted with it. BJSS Limited, a 
company registered in England and Wales (Company Number 2777575), VAT 
Registration Number 613295452, Registered Office Address, First Floor, Coronet 
House, Queen Street, Leeds, LS1 2TW.

Reply via email to