Hello All,

I am stuck with the below problem and need help from the experts !
I am using Jmeter for functional test purpose (Please dont curse me on this
:( )
We have configured 1 thread group as 1 TC.
So in my 1 thread i have all the steps that are related to 1 TC.

Problem :

First TC consists of 2 Call (Samplers) , API Call and JMS Point to Point
message.
Now the flow is :
1) Do the API call and wait for results (it works for 60 sec (running) and
then return the results)
2) Send the message to JMS (Active MQ)

Now the API call will return a success message only when the second step is
executed.
But since Jmeter executes the samplers one by one , my exeuction is stuck
at first step.
The second step is executed only when the first step (api call) is
completed.

I want to the run the first step (api call) , then trigger the seconds step
(while the first step is still under execution)
So that the message from the seconds step can be processed by the
application and get the result for the same in 1st step

Tried and Not working :
Used parallel executor and put both the samplers under the same , so that
they are triggered together.
Then added a delay to the seconds step.
Looks like the delay does not work and both the request are sent at the
same time.

Please let me know if there is any way i can implement this.


Pratik

Reply via email to