Hi Felix,
The problem started to happen in the last 3 months, before all processes were executed without this error "Response code:408" and the load was not adjusted. At this point, if we lower the load considerably, we don't get errors. The problem is that we need to test the system under load and with some stress. We need to get back to the initial load with all processes. I will reinforce with the SAP systems administration team to validate server-side connections. Thanks Franck Felix Schumacher <[email protected]> escreveu no dia sábado, 11/09/2021 à(s) 16:26: > > Am 09.09.21 um 11:38 schrieb Franck Cruz: > > Hello guys, > > I'm running JMeter to generate load on access to the SAP webclient running > some processes. > > Processes run correctly in the first few minutes but meanwhile "Response > code:408" starts to appear. > > This error only happens when I have all processes running simultaneously, > individually it doesn't occur. > > Have a look at your concurrent connections on the server side. Are you > reaching your set limits on the servers/proxies/load balancers? Do you see > any error/warning messages in the server logs? > > Are there any time limits set on those ends (like 60 s, which would match > the numbers you see in your tests). > > Take care to not overload your systems with your test plans. Start small > and increment your load, to get a feeling for the setup. > > Felix > > > We've been in talks with SAP for several weeks now, but it's still not > possible to identify the problem. > > Has something similar happened to you? Can you help identify the cause of > the problem? > > [image: image.png] > > > Thanks > > Best regards,, > > *Franck Cruz* > >
