Hey, Currently we use got 3 AMQ's spread over 3 different machines. We got it setup so that AMQ A forwards (selective channels) to B which consumes. After consuming (by Mule) it gets put back into B and B forwards to C. This works. We use the following settings (this for example is for machine A):
We like to keep this setup intact and expand upon it. We like to send a message from C to A through B without a consumer. We thought it would simply be to set a forward on B (to A) and C (to B) for the same channel. However the message does not arrive at A. Only when we send it from B to A does it arrive. So how do we make sure a channel in C gets forward to A without directly connecting them? -- View this message in context: http://activemq.2283324.n4.nabble.com/Hub-network-tp4681081.html Sent from the ActiveMQ - User mailing list archive at Nabble.com.