There are some 500 build results in the list, I guess this is what halts the delete so there is a timeout, but I have to mark each one of them for deletion?
I deleted 32 of them, and it took 5 minutes! There must be a way to set this up so that they are deleted manually each night, now where is the manual, oops doesn't exist ... Geir -----Original Message----- From: Engebakken Geir [mailto:[email protected]] Sent: 19. november 2009 16:20 To: [email protected]; Emmanuel Venisse Subject: RE: YOHO, anybody out there? RE: A lock could not be obtained within the time requested On a second thought, I guess you mean the build results in the DB of course, so I look into that now, but there is a lot! I guess there must be a way to set up purging older builds or something..... Geir -----Original Message----- From: Engebakken Geir [mailto:[email protected]] Sent: 19. november 2009 16:14 To: Emmanuel Venisse; [email protected] Subject: RE: YOHO, anybody out there? RE: A lock could not be obtained within the time requested I removed the build results (that is the output directory for the builds, which in this case was /usr/local/continuum/data/build-output-directory/67, this is what you meant?) But had the same error when deleting the project. After that I can show the project group list in the web interface, but if I click any project group, continuum hangs and I must restart continuum. Geir From: Emmanuel Venisse [mailto:[email protected]] Sent: 19. november 2009 14:03 To: [email protected] Cc: Engebakken Geir Subject: Re: YOHO, anybody out there? RE: A lock could not be obtained within the time requested Can you try to delete build results first, maybe only some of them if you have lot. Emmanuel On Thu, Nov 19, 2009 at 1:03 PM, Engebakken Geir <[email protected]<mailto:[email protected]>> wrote: This must have happened for others as well, I guess, any ideas anybody? Geir -----Original Message----- From: Engebakken Geir Sent: 17. november 2009 11:27 To: Engebakken Geir; [email protected]<mailto:[email protected]> Subject: RE: A lock could not be obtained within the time requested Forgot to say that this is continuum 1.2.2. Geir -----Original Message----- From: Engebakken Geir Sent: 17. november 2009 11:26 To: '[email protected]<mailto:[email protected]>' Subject: A lock could not be obtained within the time requested We try to remove a project in our continuum setup, and continuum just hangs and the log shows a java stacktrace in an sql select statement ending with : A lock could not be obtained within the time requested Any ideas what this might be. Geir