Hello,

e.g. there is a project A (e.g. 1.0-SNAPSHOT) which has a dependency to another 
non-released project B (e.g. 2.3-SNAPSHOT).

AFAIK performing a release which has SNAPSHOT versions is not possible.

Is there a way to tell maven that when a release of project A should be 
performed to automatically 
- perform a release of B (e.g. 2.3)
- update the dependency from A to B (so that A is dependent to B 2.3)
- and then actually perform the release of A (resulting in A 1.0)?

Regards,

Abid
-- 