Hello, I've got 1 million plus FlowFiles (nothing I can do about the count), that goto a DistributeLoad. The DistributeLoad with 2 threads, a run duration of 1 sec can only sustain ~200,000 FlowFiles / five minutes.
Is there a better design pattern or a processor that takes a Batch Size to split a Relationship into two or more? Thanks, Ryan