Hi,

I want to migrate my existing deployment to self-hosted. I have a simple deployment:

A: Machine Fedora 20
B: libvirt VM (hosted on A) RHEL 6.5 running Engine 3.3.4-1
C: Machine RHEL 6.5 acts as Hypervisor/Host/Node (VDSM 4.13.3-4)

ISO NFS Domain is on B
Data (Master) NFS Domain is on C

I want to migrate VM B to Machine C, as self-hosted, and free up Machine A

When I look at these instructions:
http://www.ovirt.org/Migrate_to_Hosted_Engine

It starts with "I installed a new host with fedora 19".

I don't understand this. Won't most people doing this migration want to start with their existing Hypervisor/Host/Node, and migrate their Engine to it? Do I really need a new 3rd machine, when my goal is to free up one of my 2 existing machines?

Or can I go ahead and assume these instructions are fine to apply to an existing Host already running VDSM 4.13.3-4?

I would have (naively?) imagined that the typical migration would be something like:

0. Upgrade Engine and Host to 3.4
1. Create a new VM
2. Install OS on new VM, start it up
3. Backup current Engine
4. Stop current Engine (leave Host and VM running), change hostname (local and DNS), maybe power off for good luck until done 5. Login to new VM (probably using ssh unless there's a way to connect directly to the VM via Spice/VNC while the Engine is down) to: A. Assign previous Engine hostname to it (local and DNS), possibly reboot
    B. Set it up as a self-hosted Engine
    C. Restore backup to it
    D. Start up new engine

What am I missing?

Thanks,
    Bob

_______________________________________________
Users mailing list
Users@ovirt.org
http://lists.ovirt.org/mailman/listinfo/users

Reply via email to