My configuration is 2 Windows PCs (machine A and B), each running Outlook
2010 with CalDav synchroniser v3.6.2, connecting to a Sogo server v4.1.1.

Synchronisation mode is set to 'Outlook to server (two way)' on both, with a
synchronisation interval of 1 minute.

When a task is marked as 'completed' on machine A, instead of updating the
state of the same task to 'completed' on machine B, a duplicate completed
task is generated on machine B. On the next sync this duplicate gets
replicated back to machine A and vice versa, resulting in an additional
duplicate being generated on both machines every minute.

Any solution to this problem would be welcome.


-- 
users@sogo.nu
https://inverse.ca/sogo/lists

Reply via email to