You need to set you max backup copies to 3 or higher under host
properties -> master server -> <hostname> -> properties -> global
attributes.
 
also, if you want to create 2 copies, you can do that in the DSSU
properties.
right click the STU, select "change" -> disk staging schedule -> check
multiple copies -> configure, set # of copies to "2", then configure the
volume pool and retention for each copy. you save a ton of time by
writing both at once, then you only need to use Vault to eject the
offsite copy.
 
 
Paul
 
 
-- 

        -----Original Message-----
        From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Mellor,
Adam A.
        Sent: August 6, 2007 12:47 AM
        To: veritas-bu@mailman.eng.auburn.edu
        Subject: [Veritas-bu] 5.1 Disk Staging & Vault Duplications
        
        
        Greetings,
         
        I believe i know the answer, but i will see if more experienced
people have delt with this before.
         
        I have a Netbackup 5.1 (MP5)  environment, I have just added a
new disk staging storage unit for Database backups.
         
        I need to get two copies of these backups put onto tape, the
first copy is easy as the DSSU takes care of that ( with the retention
specified in the policy ). I seed to get a second copy made for offsite
with a longer retention.
         
        I have set up a Vault profile for these jobs however when it
goes to duplicate the images it failes with 190, the duplicate log says
skipping ... it already has 2 copies.
         
        Vault is counting the copy on the disk, and the copy made by the
dssu staging back to tape.
         
        Is this expected behaviour or is there some way for Vault to
"ignore?" the temporary copy on disk. I imagine it is and my only option
is to up the "maximum backup copies" on the master.
         
        anybody been down this road before ?.
         
        thanks.

====================================================================================

La version française suit le texte anglais.

------------------------------------------------------------------------------------

This email may contain privileged and/or confidential information, and the Bank 
of
Canada does not waive any related rights. Any distribution, use, or copying of 
this
email or the information it contains by other than the intended recipient is
unauthorized. If you received this email in error please delete it immediately 
from
your system and notify the sender promptly by email that you have done so. 

------------------------------------------------------------------------------------

Le présent courriel peut contenir de l'information privilégiée ou 
confidentielle.
La Banque du Canada ne renonce pas aux droits qui s'y rapportent. Toute 
diffusion,
utilisation ou copie de ce courriel ou des renseignements qu'il contient par une
personne autre que le ou les destinataires désignés est interdite. Si vous 
recevez
ce courriel par erreur, veuillez le supprimer immédiatement et envoyer sans 
délai à
l'expéditeur un message électronique pour l'aviser que vous avez éliminé de 
votre
ordinateur toute copie du courriel reçu.
_______________________________________________
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

Reply via email to