Do both jobs have the same retention level set? i.e. Do they have the same expiration length? Typically different RLs will go to different tapes.
-----Original Message----- From: [email protected] [mailto:[email protected]] On Behalf Of e070924 Sent: Tuesday, November 04, 2014 12:54 PM To: [email protected] Subject: [Veritas-bu] Mystery Catalog job appearing, running... To confirm, the 2 jobs that are running are bona-fide, and valid. On my 7.5 server, then both run, and write to the same tape. On my 7.1 server, about 60% of the time, they run, but are put on seperate tapes. The catalog job has no stream-related settings from what we can see. ---How can I get both of these catalog-related jobs to *always* write to the same tape? Thanks! +---------------------------------------------------------------------- |This was sent by [email protected] via Backup Central. |Forward SPAM to [email protected]. +---------------------------------------------------------------------- _______________________________________________ Veritas-bu maillist - [email protected] http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu Athena(r), Created for the Cause(tm) Making a Difference in the Fight Against Breast Cancer __________________________________________________________ CONFIDENTIALITY NOTICE: This e-mail may contain privileged or confidential information and is for the sole use of the intended recipient(s). If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you _______________________________________________ Veritas-bu maillist - [email protected] http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
