Andrea Rossi November 21st, 2012 at 10:09 AM Dear Clovis Alan Ray: You merit this info: yesterday the third party validation of the Hot Cat has been completed. Has been good. The results have been better that in the July 16th preliminary test. We are presently manufacturing 3 1 MW E-Cats: 1- Low Temperature 1 MW E-Cat 1- 1 MW Hot Cat 1- 1 MW Hot Cat gas fueled A Report will be published after peer reviewing. We are working very hard. Warm Regards, A.R.
- [Vo]:Rossi Says .. (believe it or not) Alan Fletcher
- Re: [Vo]:Rossi Says .. (believe it or not) Alan Fletcher
- Re: [Vo]:Rossi Says .. (believe it or not) Terry Blanton
- Re: [Vo]:Rossi Says .. (believe it or not) Harry Veeder