[0] is merged, but [1] is stuck due to [2].
Vratko.
[2] https://lists.fd.io/g/vpp-dev/message/13627

From: Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco)
Sent: Monday, July 22, 2019 7:14 PM
To: vpp-api-...@lists.fd.io; vpp-dev@lists.fd.io; csit-dev 
<csit-...@lists.fd.io>
Cc: Dave Wallace (dwallac...@gmail.com) <dwallac...@gmail.com>; Ed Kern (ejk) 
<e...@cisco.com>
Subject: flag day to enable API flag day process

The main API flag document: [0].

I have most of implementation ready,
see [1] and comments there.

The missing parts is e-mail alerting
and postponing main vpp verify jobs
until API check passes (older stable/ VPP branches
are tricky to support in that way).

Please review, I would like to merge very soon.

Keeping CSIT list updated without automated
verify jobs takes some effort,
and it is pointless to add CRC checking only into CSIT
if VPP is not gated against API changes.
That is why both CSIT and ci-management parts
have to be merged together.

I will add the missing features
once the new verification is enabled.

Vratko.

[0] https://gerrit.fd.io/r/18356
[1] https://gerrit.fd.io/r/20708
-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.

View/Reply Online (#13628): https://lists.fd.io/g/vpp-dev/message/13628
Mute This Topic: https://lists.fd.io/mt/32561359/21656
Group Owner: vpp-dev+ow...@lists.fd.io
Unsubscribe: https://lists.fd.io/g/vpp-dev/unsub  [arch...@mail-archive.com]
-=-=-=-=-=-=-=-=-=-=-=-
  • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io
    • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io
      • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io
        • ... Dave Wallace
        • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io
          • ... Vratko Polak -X (vrpolak - PANTHEON TECHNOLOGIES at Cisco) via Lists.Fd.Io

Reply via email to