Hi, We have a new building currently under construction and we're looking at how best to mount our APs once the site surveys etc have been completed. This is an open concept building...ie...a few pillars but not too many walls. It is also the first building we have where there will be no drop ceiling.....ie....everything's open up to the concrete slab ceiling (12' ceilings). The easy answer is to simply mount the APs to the slab but that would put them above the mechanical infrastructure...ie...ductwork, lighting, pipes etc. How have others deployed in such a situation. I foresee us mounting the APs on rods suspended from the concrete slab that would hang down to a length that puts the APs below the mechanical equipment. Other comments or suggestions?
.............thanks in advance.................J James Savage York University Senior Communications Tech. 108 Steacie Building jsav...@yorku.ca 4700 Keele Street ph: 416-736-2100 ext. 22605 Toronto, Ontario fax: 416-736-5701 M3J 1P3, CANADA ********** Participation and subscription information for this EDUCAUSE Constituent Group discussion list can be found at http://www.educause.edu/groups/.