    We have a new building currently under construction and we're looking 
at how best to mount our APs once the site surveys etc have been 
completed.  This is an open concept building...ie...a few pillars but not 
too many walls.  It is also the first building we have where there will be 
no drop ceiling.....ie....everything's open up to the concrete slab 
ceiling (12' ceilings).  The easy answer is to simply mount the APs to the 
slab but that would put them above the mechanical 
infrastructure...ie...ductwork, lighting, pipes etc.  How have others 
deployed in such a situation.   I foresee us mounting the APs on rods 
suspended from the concrete slab that would hang down to a length that 
puts the APs below the mechanical equipment.     Other comments or 
suggestions?

.............thanks in advance.................J

James Savage                                   York University 
Senior Communications Tech.       108 Steacie Building
jsav...@yorku.ca                            4700 Keele Street
ph: 416-736-2100 ext. 22605            Toronto, Ontario
fax: 416-736-5701                                M3J 1P3, CANADA 

**********
Participation and subscription information for this EDUCAUSE Constituent Group 
discussion list can be found at http://www.educause.edu/groups/.

Reply via email to