The trouble with mixing your own cement is that there's *never* really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got lots of concrete. If a cement truck is not an option, rent a mixer. Don't skimp on the plug, it's really hard to add concrete later.. :-)

Brian Rohrbacher wrote:

That one has 7 sections and mine has 5. I never found the specs for base. I'll keep looking.

Lonnie Nunweiler wrote:

http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement and 
will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete to 
bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't move.  I've got 
some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I picked 
up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to the pipe stubs. 
 Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/




--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

Reply via email to