[ 
https://issues.apache.org/jira/browse/YARN-1290?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13809851#comment-13809851
 ] 

Hadoop QA commented on YARN-1290:
---------------------------------

{color:green}+1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12611228/YARN-1290.patch
  against trunk revision .

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:green}+1 tests included{color}.  The patch appears to include 1 new 
or modified test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

    {color:green}+1 javadoc{color}.  The javadoc tool did not generate any 
warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with 
eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new 
Findbugs (version 1.3.9) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

    {color:green}+1 core tests{color}.  The patch passed unit tests in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.

    {color:green}+1 contrib tests{color}.  The patch passed contrib unit tests.

Test results: 
https://builds.apache.org/job/PreCommit-YARN-Build/2329//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/2329//console

This message is automatically generated.

> Let continuous scheduling achieve more balanced task assignment
> ---------------------------------------------------------------
>
>                 Key: YARN-1290
>                 URL: https://issues.apache.org/jira/browse/YARN-1290
>             Project: Hadoop YARN
>          Issue Type: Improvement
>            Reporter: Wei Yan
>            Assignee: Wei Yan
>         Attachments: main.pdf, YARN-1290.patch, YARN-1290.patch, 
> YARN-1290.patch, YARN-1290.patch
>
>
> Currently, in continuous scheduling (YARN-1010), in each round, the thread 
> iterates over pre-ordered nodes and assigns tasks. This mechanism may 
> overload the first several nodes, while the latter nodes have no tasks.
> We should sort all nodes according to available resource. In each round, 
> always assign tasks to nodes with larger capacity, which can balance the load 
> distribution among all nodes.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to