[ 
https://issues.apache.org/jira/browse/YARN-10965?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andras Gyori updated YARN-10965:
--------------------------------
    Summary: Centralize queue resource calculation based on CapacityVectors  
(was: Introduce enhanced queue calculation)

> Centralize queue resource calculation based on CapacityVectors
> --------------------------------------------------------------
>
>                 Key: YARN-10965
>                 URL: https://issues.apache.org/jira/browse/YARN-10965
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: capacity scheduler
>            Reporter: Andras Gyori
>            Assignee: Andras Gyori
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> With the introduction of YARN-10930 it is possible to unify queue resource 
> calculation. In order to narrow down the scope of this patch, only the 
> PERCENTAGE capacity type and the base system is implemented here, without 
> refactoring the existing resource calculation in updateClusterResource (which 
> will be done in a different jira).



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org

Reply via email to