[ 
https://issues.apache.org/jira/browse/YARN-11000?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17717166#comment-17717166
 ] 

ASF GitHub Bot commented on YARN-11000:
---------------------------------------

brumi1024 commented on code in PR #3618:
URL: https://github.com/apache/hadoop/pull/3618#discussion_r1179074067


##########
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/TestContainerAllocation.java:
##########
@@ -1392,4 +1412,15 @@ public void 
testContainerRejectionWhenAskBeyondDynamicMax()
 
     rm1.close();
   }
+
+  private CapacityScheduler getCapacityScheduler(MockRM rm1, int memoryGb) {

Review Comment:
   The name getCapacityScheduler is misleading. A getter shouldn't set up 
clusterResources or init the queue structure. I would prefer if there was a 
separate getter and a mockCS "reinit" method, which sets up the resources and 
queues. 



##########
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager/src/test/java/org/apache/hadoop/yarn/server/resourcemanager/scheduler/capacity/TestContainerAllocation.java:
##########
@@ -1392,4 +1412,15 @@ public void 
testContainerRejectionWhenAskBeyondDynamicMax()
 
     rm1.close();
   }
+
+  private CapacityScheduler getCapacityScheduler(MockRM rm1, int memoryGb) {

Review Comment:
   The name getCapacityScheduler is misleading. A getter shouldn't set up 
clusterResources or init the queue structure. I would prefer if there was a 
separate getter and a mockCS "reinit" method, which sets up the resources and 
queues by calling the necessary methods. 





> Replace queue resource calculation logic in updateClusterResource
> -----------------------------------------------------------------
>
>                 Key: YARN-11000
>                 URL: https://issues.apache.org/jira/browse/YARN-11000
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: capacity scheduler
>            Reporter: Andras Gyori
>            Assignee: Andras Gyori
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 2h 10m
>  Remaining Estimate: 0h
>
> YARN-10965 introduces a brand new queue calculation system. In order to 
> simplify the review process, this issue replaces the current logic with the 
> newly introduced one.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org

Reply via email to