[ 
https://issues.apache.org/jira/browse/YARN-3733?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Rohith updated YARN-3733:
-------------------------
    Attachment: 0001-YARN-3733.patch

The updated patch that fixes for 2nd and 3rd scenarios(This issue scenario  
fixes) in above table and refactored the test code.

As a overall solution that solves input combination like 4th and 5th from above 
table, need to explore more on how to define fraction and how to decide which 
one is dominant. Any suggestions on this?



> DominantRC#compare() does not work as expected if cluster resource is empty
> ---------------------------------------------------------------------------
>
>                 Key: YARN-3733
>                 URL: https://issues.apache.org/jira/browse/YARN-3733
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: resourcemanager
>    Affects Versions: 2.7.0
>         Environment: Suse 11 Sp3 , 2 NM , 2 RM
> one NM - 3 GB 6 v core
>            Reporter: Bibin A Chundatt
>            Assignee: Rohith
>            Priority: Blocker
>         Attachments: 0001-YARN-3733.patch, YARN-3733.patch
>
>
> Steps to reproduce
> =================
> 1. Install HA with 2 RM 2 NM (3072 MB * 2 total cluster)
> 2. Configure map and reduce size to 512 MB  after changing scheduler minimum 
> size to 512 MB
> 3. Configure capacity scheduler and AM limit to .5 
> (DominantResourceCalculator is configured)
> 4. Submit 30 concurrent task 
> 5. Switch RM
> Actual
> =====
> For 12 Jobs AM gets allocated and all 12 starts running
> No other Yarn child is initiated , *all 12 Jobs in Running state for ever*
> Expected
> =======
> Only 6 should be running at a time since max AM allocated is .5 (3072 MB)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to