[ 
https://issues.apache.org/jira/browse/YARN-4041?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14965071#comment-14965071
 ] 

Hadoop QA commented on YARN-4041:
---------------------------------

\\
\\
| (/) *{color:green}+1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  17m 26s | Pre-patch trunk compilation is 
healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any 
@author tags. |
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to 
include 1 new or modified test files. |
| {color:green}+1{color} | javac |   7m 58s | There were no new javac warning 
messages. |
| {color:green}+1{color} | javadoc |  10m 32s | There were no new javadoc 
warning messages. |
| {color:green}+1{color} | release audit |   0m 24s | The applied patch does 
not increase the total number of release audit warnings. |
| {color:green}+1{color} | checkstyle |   0m 51s | There were no new checkstyle 
issues. |
| {color:green}+1{color} | whitespace |   0m  0s | The patch has no lines that 
end in whitespace. |
| {color:green}+1{color} | install |   1m 30s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 34s | The patch built with 
eclipse:eclipse. |
| {color:green}+1{color} | findbugs |   1m 28s | The patch does not introduce 
any new Findbugs (version 3.0.0) warnings. |
| {color:green}+1{color} | yarn tests |  57m 50s | Tests passed in 
hadoop-yarn-server-resourcemanager. |
| | |  98m 36s | |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12767585/0003-YARN-4041.patch |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 9cb5d35 |
| hadoop-yarn-server-resourcemanager test log | 
https://builds.apache.org/job/PreCommit-YARN-Build/9490/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
 |
| Test Results | 
https://builds.apache.org/job/PreCommit-YARN-Build/9490/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf902.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP 
PREEMPT Wed Sep 3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | 
https://builds.apache.org/job/PreCommit-YARN-Build/9490/console |


This message was automatically generated.

> Slow delegation token renewal can severely prolong RM recovery
> --------------------------------------------------------------
>
>                 Key: YARN-4041
>                 URL: https://issues.apache.org/jira/browse/YARN-4041
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: resourcemanager
>    Affects Versions: 2.6.0
>            Reporter: Jason Lowe
>            Assignee: Sunil G
>         Attachments: 0001-YARN-4041.patch, 0002-YARN-4041.patch, 
> 0003-YARN-4041.patch
>
>
> When the RM does a work-preserving restart it synchronously tries to renew 
> delegation tokens for every active application.  If a token server happens to 
> be down or is running slow and a lot of the active apps were using tokens 
> from that server then it can have a huge impact on the time it takes the RM 
> to process the restart.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to