[ https://issues.apache.org/jira/browse/YARN-4761?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Sangjin Lee updated YARN-4761: ------------------------------ Attachment: YARN-4761.02.patch Thanks for the pointer [~rohithsharma]. It's good to know. Posted patch v.2. I moved the unit test from {{TestCapacityScheduler}} to {{TestAbstractYarnScheduler}}. I can confirm that the test fails before the fair scheduler changes and passes after. > NMs reconnecting with changed capabilities can lead to wrong cluster resource > calculations on fair scheduler > ------------------------------------------------------------------------------------------------------------ > > Key: YARN-4761 > URL: https://issues.apache.org/jira/browse/YARN-4761 > Project: Hadoop YARN > Issue Type: Bug > Components: fairscheduler > Affects Versions: 2.6.4 > Reporter: Sangjin Lee > Assignee: Sangjin Lee > Attachments: YARN-4761.01.patch, YARN-4761.02.patch > > > YARN-3802 uncovered an issue with the scheduler where the resource > calculation can be incorrect due to async event handling. It was subsequently > fixed by YARN-4344, but it was never fixed for the fair scheduler. -- This message was sent by Atlassian JIRA (v6.3.4#6332)