Current Dev Position: YP 2.6 M3.

Next Deadline: YP 2.6 M3 Build Target is Aug. 27, 2018


SWAT Team Rotation:

·         SWAT lead is currently: Maxin

·         SWAT team rotation: Maxin -> Chen on Aug. 17, 2018

·         SWAT team rotation: Chen -> Paul on Aug. 24, 2018

·         https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

·         YP 2.6 M2 released on 8/10/18.

·         YP 2.5.1 is in QA. See 
https://wiki.yoctoproject.org/wiki/2.5_QA_Status.  It is 98% complete and 
should finish soon.

·         A summary of sstate usage was added to the initial build output which 
gives numbers for the fraction of artefacts which are being reused. We may need 
to tweak the presentation to the user but its good information to provide and 
feedback on it is welcome.

·         Glibc 2.28 is proving to have a number of issues to integrate 
including the significant size increase of its locale data, creating locale 
archives is likely the way forward for images reducing their size in 
core-image-lsb-sdk from ~900MB to ~220MB. The patches remain -next whilst fixes 
for issues are confirmed.

·         Many other miscellaneous fixes were merged covering many aspects of 
the system.

·         A potential DoS style issue was found in the bitbake checksum code 
and in fixing it the improvement of the checksumming code measurably improved 
(Thanks Ross!)

·         The sstate equivalency server work from Joshua/Garmin has review 
still pending but the related persist_data improvements are queued for merging.

·         The kernel-devsrc rework from Bruce/Windriver is pending patch 
resubmission.

·         2.4 (rocko) series stabilization continues for the next point release 
2.4.4


Planned Releases for YP 2.6:

·         YP 2.6 M3 Build Target is Aug. 27, 2018

·         YP 2.6 M3 Release Target is Sept. 7, 2018

·         YP 2.6 M4 Build Target is Oct. 1, 2018

·         YP 2.6 M4 Release Target is Oct. 26, 2018


Planned upcoming dot releases:

·         YP 2.5.1 (Sumo) is in QA.

·         YP 2.4.4 (Rocko) will be targeted after YP 2.6 M4 is done.

·         YP 2.5.2 (Sumo) will be targeted after YP 2.4.4 is done.


Tracking Metrics:

·         WDD 2592 (last week 2590) 
(https://wiki.yoctoproject.org/charts/combo.html)

·         Poky Patch Metrics

o    Total patches found: 1616 (last week 1608)

o    Percentage of patches in the Pending State: 736 (46%) [last week 730 (45%)]


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.6_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Features


The Status reports are now stored on the wiki at: 
https://wiki.yoctoproject.org/wiki/Weekly_Status


[If anyone has suggestions for other information you’d like to see on this 
weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
•    Cell:                (208) 244-4460
• Email:                             stephen.k.jol...@intel.com

-- 
_______________________________________________
yocto mailing list
yocto@yoctoproject.org
https://lists.yoctoproject.org/listinfo/yocto

Reply via email to