Last week we moved the TSM server from an IBM H70 running AIX 4.3.3 and TSM 4.2.2.4 to an IBM 6H1 running AIX 5.1.0.2 then upgraded to TSM 5.1.1.6. My database is about 51 gigs in size.
Tivoli support told me to run "cleanup backupgroup" to cleanup orphaned records when I ran into problems with expiration. I was told other activities (such as backing up the database and client backups) could take place while the command ran. After the "cleanup backupgroup" command was running for 5 hours and a backupdb had been running for 2 hours getting a 4th of the way finished when it normally, takes 30 minutes, I halted the server to kill the cleanup command. Support tells me the cleanup command could take 2 days. They also tell me the next release (2 weeks) should include the ability to background the command and restart where you left off. Does anyone have any experience running cleanup backupgroup to validate the 2 day run time? Thank you, Maria Maria Ragan Systems Engineer Unix Systems Group Yamanouchi Consumer, Inc.