TSM Server AIX 4.3.3
TSM Server Software 5.1.5.2

Why is it that anytime a client is removed from a schedule and added to a
different one the backup is missed? This always happens from my
recollection. No matter what the server version I have been it's happened.
The only way I've seen around this is to stop and start the scheduler on the
client after the client has been assigned to the new schedule.
Geoff Gill
TSM Administrator
NT Systems Support Engineer
SAIC
E-Mail:    <mailto:[EMAIL PROTECTED]> [EMAIL PROTECTED]
Phone:  (858) 826-4062
Pager:   (877) 905-7154


Reply via email to