how are most of you guys getting your design on paper for pulling permits?
I'm assuming if I design a plant layout on a napkin I need professional
plans showing ROW location, proposed cable location, depth, streets, etc
then you take that to the local building department and pull a permit?

For rural plowing, do I need a drill to cross side streets and driveways or
an I get away with a pneumatic missile ?
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to