how are most of you guys getting your design on paper for pulling permits? I'm assuming if I design a plant layout on a napkin I need professional plans showing ROW location, proposed cable location, depth, streets, etc then you take that to the local building department and pull a permit?
For rural plowing, do I need a drill to cross side streets and driveways or an I get away with a pneumatic missile ?
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com