Well lets just say that SNR and Signal levels will double or even triple depending what the sub had before conversion. Of course to get the extra power and higher capacity you will end up moving to 20 and 30mhz or 40mhz depending on your design.
We have doubled and tripled capacity on our 450i/450m Aps.

It has solved a bunch of trouble with customers who are actually working from home and just watching TV. Preseem I hope to have doing QOS soon for TV HOGS :)


On 5/20/20 1:41 PM, Josh Luthman wrote:
>I have seen some great numbers since moving to CBRS with total confidence with google.

What numbers?

Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373


On Wed, May 20, 2020 at 10:34 AM dave <dmilho...@wletc.com <mailto:dmilho...@wletc.com>> wrote:

    I am fully deployed with about 800 subs and 40 Aps with
    pmp450/450i/450m.
    I have seen some great numbers since moving to CBRS with total
    confidence with google.
    Loving the new move to 30Mhz channels and 20mhz sizes.
    We are seeing a celco fire up some of its gear though almost like
    a wall block into the metro portion of our coverage.



    On 5/20/20 8:20 AM, Josh Luthman wrote:
    It's due in 5 months.  No one says you have to be done between
    now and October.

    Josh Luthman
    Office: 937-552-2340
    Direct: 937-552-2343
    1100 Wayne St
    Suite 1337
    Troy, OH 45373


    On Wed, May 20, 2020 at 9:08 AM Adam Moffett <dmmoff...@gmail.com
    <mailto:dmmoff...@gmail.com>> wrote:

        I recall 3 SAS outages discussed on this list. One with
        Google and two with Federated.

        Whether it's production ready or not, these are the new rules
        we need to be using.


        On 5/18/2020 4:09 PM, Peter Kranz via AF wrote:

        Anyone deployed Cambium 450m gear under the new CBRS/SAS
        ruleset in an Urban environment have comments on how
        reliably your access points remain functional? i.e.
        receiving grants.. Should I consider this production ready
        at this point, or wait?

        Peter Kranz
        www.UnwiredLtd.com <http://www.unwiredltd.com/>
        Desk: 510-868-1614 x100
        Mobile: 510-207-0000
        pkr...@unwiredltd.com <mailto:pkr...@unwiredltd.com>


-- AF mailing list
        AF@af.afmug.com <mailto:AF@af.afmug.com>
        http://af.afmug.com/mailman/listinfo/af_af.afmug.com



-- AF mailing list
    AF@af.afmug.com <mailto:AF@af.afmug.com>
    http://af.afmug.com/mailman/listinfo/af_af.afmug.com



-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to