Ok, so ADSS is in between on price. Much cheaper than figure-8, but
similar labor savings.
I was wondering about drop cables though. If I have to cross a couple
of poles to get from a closure to the customer premises, I would have no
problem lashing the drop cable to a figure-8, but could I lash a few
drop cables onto an ADSS without an issue?
On 9/9/2015 3:36 PM, Jason McKemie wrote:
Might want to compare figure 8 costs to ADSS as well, the share some
of the same strengths and weaknesses. Lashed has the advantage of
being able to overlash and do mid-span aerial drops.
On Wednesday, September 9, 2015, Adam Moffett <[email protected]
<mailto:[email protected]>> wrote:
So It seems like figure-8 is almost 3 times the cost of a separate
fiber and messenger strand.....but the generally accepted wisdom
has always been that figure-8 is cheaper.
Seems like you have at least twice the labor in lashed because you
pull the whole length twice. I don't really have a basis for
comparison though. Does anybody have reasonable guesses about
labor hours spent for aerial installation on the two different
methods?