Ok, so ADSS is in between on price. Much cheaper than figure-8, but similar labor savings.

I was wondering about drop cables though. If I have to cross a couple of poles to get from a closure to the customer premises, I would have no problem lashing the drop cable to a figure-8, but could I lash a few drop cables onto an ADSS without an issue?


On 9/9/2015 3:36 PM, Jason McKemie wrote:
Might want to compare figure 8 costs to ADSS as well, the share some of the same strengths and weaknesses. Lashed has the advantage of being able to overlash and do mid-span aerial drops.

On Wednesday, September 9, 2015, Adam Moffett <[email protected] <mailto:[email protected]>> wrote:

    So It seems like figure-8 is almost 3 times the cost of a separate
    fiber and messenger strand.....but the generally accepted wisdom
    has always been that figure-8 is cheaper.

    Seems like you have at least twice the labor in lashed because you
    pull the whole length twice.  I don't really have a basis for
    comparison though.  Does anybody have reasonable guesses about
    labor hours spent for aerial installation on the two different
    methods?