Replaced a 90’ SSV with a 160’ SSV, and upgraded the site from PMP100 900Mhz. to 450i 5Ghz. in the process. Also threw some 820s backhauls in there too. The take down of old tower and installation of new tower only took a couple of hours once the crane got there, as we had to move the old 900mhz. from one tower to the next.
http://www.benroyer.net/thayer.mp4 Thank you, Ben Royer, Operations Manager Royell Communications, Inc. 217-965-3699 www.royell.net