We are expanding our office and finally have a room big enough to stage and test equipment. I'm looking for ideas on the best way to do that. Does anyone have a picture of their staging areas they would like to share?
Rory Conaway * Triad Wireless * CEO 4226 S. 37th Street * Phoenix * AZ 85040 602-426-0542 r...@triadwireless.net<mailto:r...@triadwireless.net> www.triadwireless.net<http://www.triadwireless.net/> "An optimist will tell you the glass is half-full; the pessimist, half-empty; and the engineer will tell you the glass is twice the size it needs to be"