On my project, I am doing some DBs and have a quote that I want to compare to see if its inline. It probably is, I am just dealing with sticker shock of $ 15K to do this.
It is actually 4 bores (has to make some right angles without room for "sweeps", totaling 1150 feet at $13 per foot, including 3" HDPE pipe laid in soft ground 36" deep. Paul Paul McCall, President PDMNet, Inc. / Florida Broadband, Inc. 658 Old Dixie Highway Vero Beach, FL 32962 772-564-6800 pa...@pdmnet.net<mailto:pa...@pdmnet.net> www.pdmnet.com<http://www.pdmnet.com> www.floridabroadband.com<http://www.floridabroadband.com>