This is what I had in mind.

   https://www.copper.org/applications/electrical/pq/casestudy/a6137/a6137.html

bp
<part15sbs{at}gmail{dot}com>

On 11/11/2017 10:31 AM, Lewis Bergman wrote:

I never let ignorance get in the way of having and offering an opinion.


On Sat, Nov 11, 2017, 11:10 AM <ch...@wbmfg.com <mailto:ch...@wbmfg.com>> wrote:

    Halo

    -----Original Message-----
    From: Bill Prince
    Sent: Saturday, November 11, 2017 10:05 AM
    To: af@afmug.com <mailto:af@afmug.com>
    Subject: Re: [AFMUG] Tower erection and solar system installs

    Would not be a bad idea to bond the individual rods with copper
    inter-ties. This makes sure they provide the maximum
    same-potential ground.


    bp
    <part15sbs{at}gmail{dot}com>

    On 11/10/2017 5:45 PM, Jaime Solorza wrote:
    > Going to Lubbock area on 27th to erect a 50ft. tower and three solar
    > systems with Ubiquiti radios.  My question is lightning
    related.  Our
    > sop as many of you know is to install air terminal at highest
    point of
    > tower and run ground wire to a rod buried 8 ft. deep. Since this
    area
    > is on edge of tornado alley, I am thinking of installing three rods
    > spaced out in a ring.  It will be next to a well.  Any tips or
    better
    > suggestions? Tak


Reply via email to