This is what I had in mind.
https://www.copper.org/applications/electrical/pq/casestudy/a6137/a6137.html
bp
<part15sbs{at}gmail{dot}com>
On 11/11/2017 10:31 AM, Lewis Bergman wrote:
I never let ignorance get in the way of having and offering an opinion.
On Sat, Nov 11, 2017, 11:10 AM <ch...@wbmfg.com
<mailto:ch...@wbmfg.com>> wrote:
Halo
-----Original Message-----
From: Bill Prince
Sent: Saturday, November 11, 2017 10:05 AM
To: af@afmug.com <mailto:af@afmug.com>
Subject: Re: [AFMUG] Tower erection and solar system installs
Would not be a bad idea to bond the individual rods with copper
inter-ties. This makes sure they provide the maximum
same-potential ground.
bp
<part15sbs{at}gmail{dot}com>
On 11/10/2017 5:45 PM, Jaime Solorza wrote:
> Going to Lubbock area on 27th to erect a 50ft. tower and three solar
> systems with Ubiquiti radios. My question is lightning
related. Our
> sop as many of you know is to install air terminal at highest
point of
> tower and run ground wire to a rod buried 8 ft. deep. Since this
area
> is on edge of tornado alley, I am thinking of installing three rods
> spaced out in a ring. It will be next to a well. Any tips or
better
> suggestions? Tak