If you intent to guy to the building and not to the ground, maybe 30or 40ft
above the peak. That is also significant additional loading on the
structure, be mindful of that. Can you just put it next to the building and
guy into the ground?

On Mar 20, 2018 10:22 PM, "TJ Trout" <t...@voltbb.com> wrote:

> I'm building a 40x40 or possibly 50x60 steel building. I would like to
> install a guyed 25g on the peak (about 20ft peak from ground level with
> 16ft walls)
>
> If I guy off 4 times how high can I go?
>
> Any way to do 100ft or ten sections ? I'm assuming my guy span isn't far
> out enough.....
>
> I know what's on the drawings but I am looking for some real world
> feedback....
>
> Thank you very much
>
> TJ
>