I would tell you that you are waisting money. 2 sections are going to cost
you a lot less and be a better long term solution than mounting a tower on
a building. You can use a house bracket near the top depending on your
building design and start your guy calculations from that point.

On Tue, Mar 20, 2018, 9:22 PM TJ Trout <t...@voltbb.com> wrote:

> I'm building a 40x40 or possibly 50x60 steel building. I would like to
> install a guyed 25g on the peak (about 20ft peak from ground level with
> 16ft walls)
>
> If I guy off 4 times how high can I go?
>
> Any way to do 100ft or ten sections ? I'm assuming my guy span isn't far
> out enough.....
>
> I know what's on the drawings but I am looking for some real world
> feedback....
>
> Thank you very much
>
> TJ
>