Thank you David, Mark, Danny for your inputs. I have surely made some
advances in this design now.
________________________________
From: Action Request System discussion list(ARSList)
[mailto:[email protected]] On Behalf Of Danny Kellett
Sent: Friday, January 23, 2009 5:07 PM
To: [email protected]
Subject: Re: Issues::Remedy in Load balanced environment
You don't mention how the databases are. If they are in a
cluster / RAC etc then that's good too.
[Ankur] Earlier we were planning to have two Databases with
Active Passive setup and a data guard for synching both the dbs. We have
now dropped the Data guard and now checking the feasibility of going
with Cluster Solution.
You don't mention about how you are getting your data from site
A to B. But remember a few things. There are server references within
the database so if you are doing any log shipping or db copy etc then
remember that these need to be changed. Also, you have 2 options on the
network side. You could allow your service desk / support users to have
2 servers configured in their User tool configuration and they know the
DR procedure includes ticking the DR site and unchecking the prod site.
End users in a DR situation (which is not that often in most cases, e.g.
bomb, act of god etc) would have to phone the service desk to raise
calls or the second option would be to get DNS to change the host names
to the DR IP addresses. Although this could take time to propagate
through the network etc and the same when you recover. In my experience,
the time is ok as in a DR situation e.g. building collapse, bomb, flood
etc, people are not rushing to raise change requests. How would those
incidents look (Summary: I can't connect as my office is no longer
there) J
[Ankur] Exactly. Totally agree with you. :)
Just remember that to bring all other servers in the server
group down except the one running the admin thread, make your changes,
then bring the others up. As for coping to the DR site, that is not
effecting your service SLA and can be done over the next few hours via
log shipping/data guard etc.
[Ankur] Yeah will have to think of something on this as now we
have cancelled the idea of having Data guard.
4. Is there some recommendation for setting the stickiness
value in the load balancer.
If you have a load balancer in front of midtiers then set the
session infinity (sticky) bit but not on the load balancers in front of
the AR Servers.
[Ankur] This is something I am discussing with our IT guys, They
have planned for just one Load Balancer which will be used by midtiers
as well as for AR Servers. Users will use the LB to connect to midtier
and midtier will use the same LB to connect to AR Server.
5. Has someone used this kind of scenario with F5 Load balancer
and can share how things are configured? Remedy only has a documentation
with Cisco LB.
I can request but I don't think we can share too much info at
this site. If I can I will forward to your email and not on the list.
[Ankur] Appreciate your help Danny.
From: Action Request System discussion list(ARSList)
[mailto:[email protected]] On Behalf Of Ankur Gulati
Sent: 22 January 2009 14:35
To: [email protected]
Subject: Issues::Remedy in Load balanced environment
**
Hi Listers,
I've been assigned a task of developing a load balanced
environment for our remedy infrastructure. It has become a headache now
since I am stuck with few things.
Here's bit of description of the architecture.
We have planned for having two sites A and B, A will be Primary
and B a Disaster Recovery Site.
On the top we have Users connecting through Citrix to any of the
ARS application servers through two F5 1600 Load Balancer. The Load
Balancers are in active - passive mode with a switch above them to
shift the connection incase any of the LB goes down.
Then we have 4 ARS application server all in Active mode in
server group architecture. These servers have two Database to connect
to. Databases are in Active - Passive mode. Each of these DBs are
connected to their own SAN for storage. We will have a dataguard for
replication of the database.
DSO is not proposed in this architecture. We have a home grown
application.
ARS version 7.1.0 on Solaris 10
Oracle 10g on RHEL 5
Midtier 7.1.0 on Windows 2003 server
Questions that concern us are:
1. Will this architecture be feasible solution for failover and
high availability?
2. How will we find out incase any of the server goes down? Is
there any need for health check script to run on each of the ARS Server
box to see if the server is alive or not?
3. To have a zero downtime at the time of application upgrade,
if we take one side completely down then is there an option in Load
Balancer to restrict the users to access the admin server so that we can
use it to do our workflow updates in the passive database. Then the
dataguard will copy the changes from this database to the active. Is
this scenario possible? if not then is there any other option where I
can achieve zero downtime or minimal downtime for workflow and form
updates.
4. Is there some recommendation for setting the stickiness value
in the load balancer.
5. Has someone used this kind of scenario with F5 Load balancer
and can share how things are configured? Remedy only has a documentation
with Cisco LB.
6. Are there any critical things you'd like to list which needs
to be taken care of in this environment.
Any thoughts are appreciated.....!
--
Ankur
__Platinum Sponsor: RMI Solutions ARSlist: "Where the Answers
Are" html___
__Platinum Sponsor: RMI Solutions ARSlist: "Where the Answers
Are" html___
_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
Platinum Sponsor: RMI Solutions ARSlist: "Where the Answers Are"