This is probably your fastest option if you can't do a BCV split:

http://download.oracle.com/docs/cd/B19306_01/server.102/b14231/tspaces.htm#i1007197

<http://download.oracle.com/docs/cd/B19306_01/server.102/b14231/tspaces.htm#i1007197>or
you could look to copy the data, control, and redo log files from one server
to the other.

On Thu, Dec 9, 2010 at 5:22 PM, G. Lafontant <gelaf...@gmail.com> wrote:

> **
> Well, I won't be the one to do it, however, our dba will... We're
> contemplating the idea of moving away from our current IBM AIX 5.3 platform
> to Windows 2008 server with a fresh install of ARS7.6 and Applications on a
> fresh Oracle 10g box.  And we'd like an idea, if that is even feasible, on
> how long will it take the dba to migrate the 600gig of data to that
> identical Oracle 10g box.
>
> below is our current Production hardware specs.
>
> Current Prod Platform:
> IBM AIX 5.3 64bit
> 4 CPU Dual core
> 8GB RAM
> ARS7.1 P4
> ITSM7.0.03 P7
> CMDB2.0.1 P9
>
> *Oracle 10g*
> IBM AIX 5L V5.3 64bit
> 4 CPU dual
> 16gig RAM
>
>
>
> On 12/9/2010 5:01 PM, Soria, Joe wrote:
>
> There are many ways to perform this task. To name a few:
>
> 1) perform a cold backup of the database -> copy to new server
> 2) export/import
> 3) using data pump
> 4) using oracle's database creation assistant (DBCA)
>
> My recommendation is, if you are not familiar with these terms/tools.
> Find a DBA. What version of Oracle are you going from to?
>
> -----Original Message-----
> From: Action Request System discussion list(ARSList)
> _attend WWRUG11 www.wwrug.com  ARSlist: "Where the Answers Are"_
>
>

_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
attend wwrug11 www.wwrug.com ARSList: "Where the Answers Are"

Reply via email to