1.0 KW system Grant $8000.00 govt paid RECs $800.00 govt paid System cost $8920.00
Tile brackets $120.00 my cost Level 2 electrician connect to grid $360.00 my cost $2500.00 deposit loss of interest @ 5% average rate 12 months $412.50 my loss Cost and Loss total $895.50 divided by $0.60 = 1492.5 KW breakeven 4.08 KW per day 365 day approx breakeven Winter average currently 3.4 KW System faces west not optimum eg north facing. Also did the solar hot water rebates $1600.00 federal and $500.00 state Installed 63 days ago all refunds received.
_______________________________________________ Aus-soaring mailing list [email protected] To check or change subscription details, visit: http://lists.internode.on.net/mailman/listinfo/aus-soaring
