1.0 KW system
Grant $8000.00 govt paid
RECs $800.00 govt paid

System cost $8920.00

Tile brackets $120.00 my cost
Level 2 electrician connect to grid $360.00 my cost
$2500.00 deposit loss of interest @ 5% average rate 12 months $412.50 my loss

Cost and Loss total $895.50 divided by $0.60 = 1492.5 KW breakeven 4.08 KW per 
day 365 day approx breakeven

Winter average currently 3.4 KW

System faces west not optimum eg north facing.

Also did the solar hot water rebates $1600.00 federal and $500.00 state

Installed 63 days ago all refunds received. 
_______________________________________________
Aus-soaring mailing list
[email protected]
To check or change subscription details, visit:
http://lists.internode.on.net/mailman/listinfo/aus-soaring

Reply via email to