I have production order scheduled and started, with a job ID, for 
example I have planned 1 hour for that job.

Later on I updated the job 3 times via Job Card Journal.

Updated and posted 1st journal with 0.25 hour
Updated and posted 2nd journal with 0.5 hour
Updated and posted 3rd journal with 0.35 hour

Total is 1.1 hour (exceeded original plan of 1 hour).

The job status now is "Ended"

Then I need to post a correction job card journal, for example I 
updated and posted 4th journal with -0.5 hour.

So after 4th journal my total posted job hours = 0.6 hour (less than 
planned hour).

But when I look into my production job, the job status is still 
= "ended". Why is this? How to reset the job status back 
to "started"?