Hi,

One way one of doing this would be to set a minimum order quantity of 40 
(Inventory fieldgroup on Quantity tab in the Item form) and then set the Item 
coverage type to Period. Whenever you create orders of less than 40 they will 
be grouped within the specified period (eg. 10 days) and a production order of 
minimum 40 pcs will be planned.


Regards,
Anders Sorensen

This posting is provided "AS IS" with no warranties, and confers no rights.

-----Original Message-----
From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] On 
Behalf Of Lukas Nugroho Putro
Sent: 25. maj 2007 09:13
To: Axapta-Knowledge-Village@yahoogroups.com
Subject: [Axapta-Knowledge-Village] Capacity Planning per Quota

Dear all,

I want to know whether Master Planning can provide planned production order 
based on quota in some workcenter. My client has a request that planned 
production order can be created based on quota on workcenter because some of 
their workcenter can only be used if the quantity of production fulfilled. 
Example he has a boiler that can be run if the quantity is 40. The workcenter 
can not be run if the quantity under 40

can anyone help me. thank in advance


Lukas nugroho

       Shape Yahoo! in your own image.  Join our Network Research Panel 
today!http://us.rd.yahoo.com/evt=48517/*http://surveylink.yahoo.com/gmrs/yahoo_panel_invite.asp?a=7
 hot CTA = Join our Network Research Panel

[Non-text portions of this message have been removed]



Sharing the knowledge on Axapta.
Visit www.frappr.com/axapta for axapta friends.

Come and choose your preferred name for Microsoft Dynamics AX on the Axapta 
Knowledge Village, Visit www.axapta-knowledge-village.tk


Yahoo! Groups Links



Reply via email to